February 25, 2013

Construction Updates


Aerial view of the brewery

Floor drains were filled with cement
Exhaust fan installed





Over the last few days, lots has happened at Blackthorn.  The floor drains arrived and cement was poured, the giant exhaust fan was installed and construction on The Pub began. I got a ride on the pneumatic lift took an aerial picture of the brewery.

Enjoy!



The Pub started to get framed