November 16, 2012

Demo Week 3

Week 3 of demo concluded with the installation of new plumbing pipes for the taproom and kitchenette.



Pipe for sink in taproom

Plumbing for keg washer

Bottling line/bathroom/taproom connection

The taproom will be in this corner!

November 9, 2012

Demo Week 2

Week Two of demolition was exciting!  The crew starting digging the trenches for the floor drains and additional plumbing.  Structural beams for the taproom were delivered.



Trench for keg washer drain

Trench for bottling line drain

Can't wait to paint over the cheerleading designs!

Ceiling beams for the taproom

Wall studs for the taproom